1753169 - PO not created from bidding engine
Please apply this note in ECC system
symptom
You create a PR in the ECC backend system and send it to the SRM bidding engine. In SRM, a PO is
created from the PR and replicated to ECC. The replication fails with the error message mepo 301:
Purchase requisition is in external sourcing.
Muthu