At the time of standard cost estimate CK11N

The bellow attached error coming

But i maintained cost component structure correct

my cost component structure is

1 rm cost

2 mat oh

3 conversation oh

4 clean

5 machine

6 labour

 

At the time of running error is bellow

Costing item 00001is not assigned to a cost component

Costing item 00002 is not assigned to a cost component

Costing item 00003is not assigned to a cost component

Costing item 00004 is not assigned to a cost component

Costing item 00005 is not assigned to a cost component

Costing item 00006 is not assigned to a cost component