Hi Riyas,
Deleting Cost Elements in the Background
- If you want to delete many cost elements, the checks for dependent data take some time. You should therefore carry out the deletion in the background at times of minimal system usage.
To do so, choose Background processing.
- Choose Execute and answer the confirmation prompt with Yes. ( T Code: KA04)
- Enter a job name in the dialog box.
- Enter a date and time for the planned start or select Immediate start.
You can also define from which date and from which time no more starts should occur.
- Choose Confirm to leave the dialog box.In the next dialog box, choose Save.
The R/3 System deletes the cost elements at the date specified.
- To check the current status of the job, choose System
Status of Background Job T Code: SM37 and Execute.
Regards,
Pavan Kumar Arvapally